Gas
Combined Cycle
Gas Turbines
Renewables
Biomass
Hydroelectric
Solar
Wind
Coal
Clean Coal Technologies
Material Handling
Nuclear
Reactors
Waste Management & Decommissioning
O&M
Plant Optimization
Water Treatment
Energy Storage
Hydrogen
Emissions
Resources
Webinars
Whitepapers
About Us
Subscribe
Advertise
Events
Media Partners
POWERGEN International
Submit an Article
Magazine Issue Archive
Search for:
Subscribe
POWERGEN 2024
+ Series
Whitepapers
Clarion Energy Content Directors
Clarion Energy Content Directors
16869 posts
Babcock & Wilcox receives $246 million contract for coal-to-gas project
03.18.2024
B&W will convert the unspecified plant’s two coal-fired boilers – totaling more than 1,000 MW – to use natural gas fuel.
Michigan regulators reject Consumers Energy proposal to exit biomass plant PPAs early
03.18.2024
Among other actions by the Michigan Public Service Commission was the approval of a 220 MW/800 MWh battery storage facility at the site of the former Trenton Channel coal-fired plant.
Navigating the transition: Insights from Siemens Energy North America President Rich Voorberg
03.18.2024
Siemens Energy North America President Rich Voorberg sat down with us at POWERGEN to discuss the unprecedented challenges the electric power sector is facing. He shared why he remains optimistic and how the industry must respond to get to net-zero.
Democratic legislators oppose Dominion’s proposed Chesterfield natural gas plant
03.15.2024
Dominion argues the 1000-MW plant would ensure electric grid reliability during expected surges in power demands over the next 15 to 25 years.
1-GWh battery now operational in Arizona for solar site powering Google data center
03.15.2024
Sonoran Solar Energy Center is a 260-megawatt (MW) solar facility with the ability to charge a 1 gigawatt-hour (GWh) battery energy storage system, located south of Buckeye, Arizona.
DOE commits $750M to advance U.S. hydrogen industry
03.14.2024
52 projects across 24 states aim to accelerate breakthroughs in clean hydrogen technology and support DOE’s hydrogen hubs and other large-scale deployments.
Washington state lawmakers allocate $25 million to advance SMR development
03.14.2024
Utility Energy Northwest wants to develop a 960 MW small modular reactor project nuclear-powered Columbia Generating Station.
DOE releases $1.6 billion budget for nuclear energy office: Here’s how it would be spent
03.13.2024
The budget request includes funding to develop advanced reactor technologies and secure a near-term supply of HALEU fuel.
03.14.2024
DOE commits $750M to advance U.S. hydrogen industry
52 projects across 24 states aim to accelerate breakthroughs in clean hydrogen technology and support DOE’s hydrogen hubs and other large-scale deployments….
03.14.2024
Washington state lawmakers allocate $25 million to advance SMR development
Utility Energy Northwest wants to develop a 960 MW small modular reactor project nuclear-powered Columbia Generating Station. …
03.13.2024
DOE releases $1.6 billion budget for nuclear energy office: Here’s how it would be spent
The budget request includes funding to develop advanced reactor technologies and secure a near-term supply of HALEU fuel. …
03.13.2024
AES Indiana wants to convert its remaining coal units to natural gas
Petersburg Units 3 and 4 each have a nameplate capacity of 690 MW and came online in 1977 and 1986, respectively. …
03.13.2024
Quaise Energy raises $21 million for terawatt-scale ‘deep’ geothermal
Quaise says a deep geothermal power plant can create 10x more energy than conventional geothermal and provide 24/7 baseload power on a small land footprint….
03.12.2024
Oklo and Argonne claim milestone in fast fission test
The THETA testing campaign is focused on the key thermal-hydraulic behavior of Oklo’s fast fission reactor design….
03.12.2024
Oklo and Argonne claim milestone in fast fission test
The THETA testing campaign is focused on the key thermal-hydraulic behavior of Oklo’s fast fission reactor design….
03.12.2024
Austin Energy says it needs more time to evaluate exit of large coal-fired plant
Austin’s Mayor wants the city out of the Fayette Power Project by January 2029, but the exit could take longer….
03.12.2024
Utah bets on selling coal power at a premium price, but other western states may not want it
Assuming coal will be the cheapest option for decades may impact ratepayers, advocates warn …
03.11.2024
Fluor and Longview start design work on laser fusion plant
Fluor will provide preliminary design and engineering to support the development of Longview’s fusion-powered plant….
Load More